Triple

T9877623
Position Surface form Disambiguated ID Type / Status
Subject Highway 2000 E240111 entity
Predicate instanceOf P0 FINISHED
Object toll motorway system C3789 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: toll motorway system
Context triple: [Highway 2000, instanceOf, toll motorway system]
  • A. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • B. toll road chosen
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • C. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • D. toll bridge system
    A toll bridge system is a coordinated set of hardware, software, and procedures that manages vehicle identification, fee calculation, payment processing, and access control for crossing a bridge.
  • E. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e8a0788190b9061811d50fd554 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:37 p.m.