Triple

T9874993
Position Surface form Disambiguated ID Type / Status
Subject Caloosahatchee River E240050 entity
Predicate isPartOfProject P14971 FINISHED
Object Central and Southern Florida Flood Control Project E123208 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central and Southern Florida Flood Control Project | Statement: [Caloosahatchee River, isPartOfProject, Central and Southern Florida Flood Control Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central and Southern Florida Flood Control Project
Context triple: [Caloosahatchee River, isPartOfProject, Central and Southern Florida Flood Control Project]
  • A. Central and Southern Florida Project chosen
    The Central and Southern Florida Project is a large-scale federal water management and flood control system that extensively altered the Everglades and laid the groundwork for later restoration efforts.
  • B. Kissimmee River Restoration Project
    The Kissimmee River Restoration Project is a large-scale environmental initiative in Florida aimed at restoring the river’s natural flow and wetland ecosystem after decades of channelization and ecological degradation.
  • C. Green Brook Flood Control Project
    The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
  • D. Miami Conservancy District
    The Miami Conservancy District is a regional flood control and water management agency in southwest Ohio responsible for protecting communities along the Great Miami River and its tributaries.
  • E. Carroll Creek flood control project
    Carroll Creek flood control project is an urban water management and revitalization initiative in Frederick, Maryland, designed to prevent flooding while supporting public spaces, trails, and downtown redevelopment along Carroll Creek.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e8a0788190b9061811d50fd554 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb3f9d82c81908afb4977ce4e3e4a completed April 2, 2026, 12:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1e47515788190b6644021e187e771 completed April 5, 2026, 4:26 a.m.
Created at: March 30, 2026, 8:37 p.m.