Triple

T9872233
Position Surface form Disambiguated ID Type / Status
Subject Port of Larne E239984 entity
Predicate instanceOf P0 FINISHED
Object freight port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: freight port
Context triple: [Port of Larne, instanceOf, freight port]
  • A. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • B. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • C. port crane
    A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
  • D. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • E. port area
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e8a0788190b9061811d50fd554 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:37 p.m.