Triple

T9870702
Position Surface form Disambiguated ID Type / Status
Subject SS-25 Sickle E239948 entity
Predicate instanceOf P0 FINISHED
Object road-mobile missile system C26571 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road-mobile missile system
Context triple: [SS-25 Sickle, instanceOf, road-mobile missile system]
  • A. long-range land-attack missile
    A long-range land-attack missile is a guided weapon system designed to strike fixed or relocatable targets deep inland from significant stand-off distances, typically launched from air, sea, or ground platforms.
  • B. multiple rocket launcher
    A multiple rocket launcher is a mobile artillery system equipped with several rocket tubes or rails that can fire multiple unguided or guided rockets in rapid succession to deliver concentrated firepower over a wide area.
  • C. anti-armor missile
    An anti-armor missile is a guided munition designed specifically to detect, track, and destroy armored targets such as tanks and armored vehicles using high-penetration warheads.
  • D. self-propelled surface-to-air missile system
    A self-propelled surface-to-air missile system is a mobile, ground-based weapons platform that integrates its own propulsion, radar, and missile launch capabilities to detect, track, and engage airborne targets.
  • E. cruise missile
    A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e7506c819095cbde4ff16512bb completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:36 p.m.