Triple

T9870654
Position Surface form Disambiguated ID Type / Status
Subject RT-2PM Topol E239947 entity
Predicate instanceOf P0 FINISHED
Object road-mobile ICBM C2426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road-mobile ICBM
Context triple: [RT-2PM Topol, instanceOf, road-mobile ICBM]
  • A. cruise missile
    A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
  • B. ballistic missile chosen
    A ballistic missile is a guided projectile that is launched into a high, arching trajectory and primarily follows a ballistic path under gravity to deliver a warhead to a distant target.
  • C. military rocket
    A military rocket is a self-propelled, unguided or guided weapon system that uses rocket propulsion to deliver explosive or specialized payloads to a target for combat or strategic purposes.
  • D. strategic missile force
    A strategic missile force is a military organization equipped with long-range, often nuclear-capable missiles designed to deter adversaries and conduct deep-strike operations against high-value strategic targets.
  • E. air and missile defense interceptor
    An air and missile defense interceptor is a guided weapon system designed to detect, track, and destroy incoming aircraft, cruise missiles, or ballistic missiles before they reach their targets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e7506c819095cbde4ff16512bb completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:36 p.m.