Triple

T9857378
Position Surface form Disambiguated ID Type / Status
Subject Expressway S17 E239620 entity
Predicate hasJunctionWith P1018 FINISHED
Object Expressway S19 E243481 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Expressway S19 | Statement: [Expressway S17, hasJunctionWith, Expressway S19]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Expressway S19
Context triple: [Expressway S17, hasJunctionWith, Expressway S19]
  • A. Expressway S12
    Expressway S12 is a major Polish expressway forming part of the national high-speed road network in eastern and central Poland.
  • B. expressway S19 chosen
    Expressway S19 is a major Polish expressway forming part of the international Via Carpatia corridor, running north–south through eastern Poland and connecting cities such as Lublin with the Slovak border.
  • C. expressway S17
    Expressway S17 is a major Polish expressway connecting Warsaw with Lublin and further towards the Ukrainian border, serving as an important transport corridor in eastern Poland.
  • D. Expressway S2
    Expressway S2 is a major Polish expressway forming part of the southern bypass of Warsaw, connecting key national routes and facilitating transit traffic around the city.
  • E. Expressway S8
    Expressway S8 is a major Polish expressway forming part of the national high-speed road network, connecting key cities including Warsaw and Wrocław.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e6493081909cf58c8d42ea856b completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb39864188190a2d8c0ee911f00c2 completed April 2, 2026, 12:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2287bbdf88190acd23f9572213e8a completed April 5, 2026, 9:16 a.m.
Created at: March 30, 2026, 8:35 p.m.