Triple
T9837966
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pragyan |
E239150
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | lunar rover |
C26931
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: lunar rover Context triple: [Pragyan, instanceOf, lunar rover]
-
A.
Mars rover instrument
A Mars rover instrument is a specialized scientific device mounted on a Mars rover that measures, analyzes, or images the Martian environment and geology to support planetary research and exploration objectives.
-
B.
Apollo Lunar Module
The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
-
C.
rotorcraft lander
A rotorcraft lander is a vertical-takeoff-and-landing spacecraft or planetary probe that uses powered rotors instead of rockets or wings to descend, land, and maneuver near a surface.
-
D.
lunar exploration program
A lunar exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study, visit, and potentially utilize the Moon’s environment and resources.
-
E.
lunar landing mission
A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84e314108190978324a4bdb959f8 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:33 p.m.