Triple

T9837683
Position Surface form Disambiguated ID Type / Status
Subject Pegasus XL E239143 entity
Predicate stagesConfiguration P7615 FINISHED
Object three-stage solid rocket LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: three-stage solid rocket | Statement: [Pegasus XL, stagesConfiguration, three-stage solid rocket]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: stagesConfiguration
Context triple: [Pegasus XL, stagesConfiguration, three-stage solid rocket]
  • A. stages
    Indicates that one entity organizes, presents, or sets up another entity (such as an event, performance, or situation) to take place or be displayed.
  • B. stageConfiguration
    Indicates the specific arrangement or setup of components, elements, or conditions at a particular stage within a process or system.
  • C. numberOfStages chosen
    Indicates the total count of distinct stages or phases associated with a given process, event, or entity.
  • D. setsStageFor
    Indicates that one event, condition, or action creates the necessary circumstances or groundwork for another to occur.
  • E. stage3Includes
    Indicates that a process or workflow’s third stage contains, encompasses, or incorporates a specified component, step, or element.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e314108190978324a4bdb959f8 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb347ff4c81908c312548a25bae71 completed April 2, 2026, 12:07 a.m.
PD Predicate disambiguation batch_69cd03e30bc08190816c0a6d29c21b0f completed April 1, 2026, 11:39 a.m.
Created at: March 30, 2026, 8:33 p.m.