Triple

T9831116
Position Surface form Disambiguated ID Type / Status
Subject Camp Colera E238983 entity
Predicate typicalRouteAssociation P45128 FINISHED
Object Normal Route on Aconcagua E223742 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Normal Route on Aconcagua | Statement: [Camp Colera, typicalRouteAssociation, Normal Route on Aconcagua]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Normal Route on Aconcagua
Context triple: [Camp Colera, typicalRouteAssociation, Normal Route on Aconcagua]
  • A. Normal Route on Aconcagua chosen
    The Normal Route on Aconcagua is the most commonly used, non-technical ascent path to the mountain’s summit, favored for its relatively easier terrain and logistical accessibility.
  • B. Aconcagua west face
    Aconcagua west face is the imposing, often snow-covered western slope of Aconcagua, the highest mountain in the Americas, known for its dramatic rock walls and challenging climbing routes.
  • C. Camp III on the Lhotse Face
    Camp III on the Lhotse Face is a high-altitude staging camp on Mount Everest’s steep western flank, used by climbers as a critical acclimatization and launch point on the standard South Col route to the summit.
  • D. Southeast Ridge route on Mount Everest
    The Southeast Ridge route on Mount Everest is the classic, most frequently used climbing route from the Nepal side, ascending via the South Col to the mountain’s summit.
  • E. Mischabel ridge traverse
    The Mischabel ridge traverse is a classic, highly exposed alpine climbing route in the Swiss Alps that links several major peaks of the Mischabel range, including the Täschhorn and Dom.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: typicalRouteAssociation
Context triple: [Camp Colera, typicalRouteAssociation, Normal Route on Aconcagua]
  • A. trailAssociation
    Indicates an associative relationship between entities where one is contextually or functionally linked to a trail (such as being located on, connected to, or part of that trail).
  • B. associatedWithRouteNetwork
    Indicates a relationship where something is linked or connected to a specific route network.
  • C. notableRouteType
    Indicates that a route is particularly significant or well-known for a specific type or category (e.g., scenic, historic, commercial).
  • D. tradRoutes
    Indicates a relationship where one location serves as a trade route to or from another location, facilitating the movement of goods or commerce between them.
  • E. isMostCommonRouteTo chosen
    Indicates that one route is the most frequently used or typical way to reach a particular destination or outcome compared to all other possible routes.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e314108190978324a4bdb959f8 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb3297bd88190bf8c53a4ba00e0ae completed April 2, 2026, 12:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1ead061388190abbed7eb29e8ea52 completed April 5, 2026, 4:53 a.m.
PD Predicate disambiguation batch_69cd03e30bc08190816c0a6d29c21b0f completed April 1, 2026, 11:39 a.m.
Created at: March 30, 2026, 8:32 p.m.