Triple

T9817878
Position Surface form Disambiguated ID Type / Status
Subject Shanghai Pudong International Airport station E238453 entity
Predicate hasConnection P8776 FINISHED
Object Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)
The Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal) is a high-speed magnetic levitation rail service linking central Shanghai’s Longyang Road station directly to Shanghai Pudong International Airport.
E823464 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal) | Statement: [Shanghai Pudong International Airport station, hasConnection, Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)
Context triple: [Shanghai Pudong International Airport station, hasConnection, Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)]
  • A. Shanghai Metro Line 9
    Shanghai Metro Line 9 is a major east–west rapid transit line in Shanghai that connects key residential, commercial, and historic areas, including the Former French Concession, with the broader metro network.
  • B. Shanghai Metro Line 10
    Shanghai Metro Line 10 is a major east–west rapid transit line in Shanghai that serves key central districts, including the Former French Concession, and connects important commercial and residential areas across the city.
  • C. Shanghai Metro Line 11
    Shanghai Metro Line 11 is a major rapid transit line in Shanghai that connects the city center with suburban areas including the Shanghai Disney Resort.
  • D. Shanghai Metro Line 16
    Shanghai Metro Line 16 is a suburban rapid transit line in Shanghai that primarily serves the southeastern Pudong area, connecting the city to outlying districts and popular destinations like the Dishui Lake area.
  • E. Shanghai Metro Line 14
    Shanghai Metro Line 14 is a major east–west rapid transit line in Shanghai’s metro system that serves key commercial and financial districts, including the Lujiazui area in Pudong.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)
Triple: [Shanghai Pudong International Airport station, hasConnection, Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)]
Generated description
The Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal) is a high-speed magnetic levitation rail service linking central Shanghai’s Longyang Road station directly to Shanghai Pudong International Airport.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal)
Target entity description: The Shanghai Maglev Longyang Road–Pudong International Airport line (via airport terminal) is a high-speed magnetic levitation rail service linking central Shanghai’s Longyang Road station directly to Shanghai Pudong International Airport.
  • A. Shanghai Metro Line 9
    Shanghai Metro Line 9 is a major east–west rapid transit line in Shanghai that connects key residential, commercial, and historic areas, including the Former French Concession, with the broader metro network.
  • B. Shanghai Metro Line 10
    Shanghai Metro Line 10 is a major east–west rapid transit line in Shanghai that serves key central districts, including the Former French Concession, and connects important commercial and residential areas across the city.
  • C. Shanghai Metro Line 11
    Shanghai Metro Line 11 is a major rapid transit line in Shanghai that connects the city center with suburban areas including the Shanghai Disney Resort.
  • D. Shanghai Metro Line 16
    Shanghai Metro Line 16 is a suburban rapid transit line in Shanghai that primarily serves the southeastern Pudong area, connecting the city to outlying districts and popular destinations like the Dishui Lake area.
  • E. Shanghai Metro Line 14
    Shanghai Metro Line 14 is a major east–west rapid transit line in Shanghai’s metro system that serves key commercial and financial districts, including the Lujiazui area in Pudong.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84dfde1481909f47c286d715f892 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb2f5bfa481908a2d2cb3f3d7d585 completed April 2, 2026, 12:06 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1cc70d1188190820a49766699b94a completed April 5, 2026, 2:44 a.m.
NEDg Description generation batch_69d1cf9669308190a58e58b86e652801 completed April 5, 2026, 2:57 a.m.
NED2 Entity disambiguation (via description) batch_69d1d0034dc081908182e3f873a2c584 completed April 5, 2026, 2:59 a.m.
Created at: March 30, 2026, 8:30 p.m.