Triple

T9809018
Position Surface form Disambiguated ID Type / Status
Subject CANDELS survey E238221 entity
Predicate proposalType P90121 FINISHED
Object HST Multi-Cycle Treasury program
The HST Multi-Cycle Treasury program was a major Hubble Space Telescope initiative that allocated large, multi-year observing campaigns to address broad, high-impact astrophysical questions and produce legacy datasets for the community.
E822857 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: HST Multi-Cycle Treasury program | Statement: [CANDELS survey, proposalType, HST Multi-Cycle Treasury program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: HST Multi-Cycle Treasury program
Context triple: [CANDELS survey, proposalType, HST Multi-Cycle Treasury program]
  • A. Hubble Space Telescope Servicing Mission 3A
    Hubble Space Telescope Servicing Mission 3A was a 1999 Space Shuttle mission that repaired and upgraded the Hubble Space Telescope to restore its scientific capabilities.
  • B. Great Observatories program
    The Great Observatories program is a NASA initiative comprising a suite of space-based telescopes operating across different regions of the electromagnetic spectrum to provide complementary views of the universe.
  • C. Hubble Space Telescope Servicing Mission 3B
    Hubble Space Telescope Servicing Mission 3B was a 2002 Space Shuttle mission that upgraded and repaired the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • D. Hubble Servicing Mission 4
    Hubble Servicing Mission 4 was NASA’s final space shuttle mission to upgrade and repair the Hubble Space Telescope, restoring and enhancing its scientific capabilities.
  • E. HST
    HST is a high-speed passenger train designed to operate at significantly higher speeds than conventional rail services, often used for rapid intercity travel.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: HST Multi-Cycle Treasury program
Triple: [CANDELS survey, proposalType, HST Multi-Cycle Treasury program]
Generated description
The HST Multi-Cycle Treasury program was a major Hubble Space Telescope initiative that allocated large, multi-year observing campaigns to address broad, high-impact astrophysical questions and produce legacy datasets for the community.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: HST Multi-Cycle Treasury program
Target entity description: The HST Multi-Cycle Treasury program was a major Hubble Space Telescope initiative that allocated large, multi-year observing campaigns to address broad, high-impact astrophysical questions and produce legacy datasets for the community.
  • A. Hubble Space Telescope Servicing Mission 3A
    Hubble Space Telescope Servicing Mission 3A was a 1999 Space Shuttle mission that repaired and upgraded the Hubble Space Telescope to restore its scientific capabilities.
  • B. Great Observatories program
    The Great Observatories program is a NASA initiative comprising a suite of space-based telescopes operating across different regions of the electromagnetic spectrum to provide complementary views of the universe.
  • C. Hubble Space Telescope Servicing Mission 3B
    Hubble Space Telescope Servicing Mission 3B was a 2002 Space Shuttle mission that upgraded and repaired the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • D. Hubble Servicing Mission 4
    Hubble Servicing Mission 4 was NASA’s final space shuttle mission to upgrade and repair the Hubble Space Telescope, restoring and enhancing its scientific capabilities.
  • E. HST
    HST is a high-speed passenger train designed to operate at significantly higher speeds than conventional rail services, often used for rapid intercity travel.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: proposalType
Context triple: [CANDELS survey, proposalType, HST Multi-Cycle Treasury program]
  • A. proposalProcess
    Indicates the process or sequence of actions involved in creating, submitting, reviewing, and deciding on a proposal between entities.
  • B. proposes
    Indicates that one entity formally suggests or puts forward an idea, plan, or course of action to another entity for consideration or approval.
  • C. notableProposal
    Indicates that an entity is a proposal distinguished by particular significance, impact, or recognition compared to other proposals.
  • D. proposalOutcome
    Indicates the result or status assigned to a proposal after it has been evaluated or decided upon.
  • E. governmentFormProposed
    Indicates that a particular form or structure of government has been put forward as a proposal by an entity.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84defac48190abc1148804f184c1 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb21ef32c8190ab4b09d157798451 completed April 2, 2026, 12:02 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1cc5b4dd8819088c86946b4eb8a39 completed April 5, 2026, 2:43 a.m.
NEDg Description generation batch_69d1cd7f41448190b387109235dbc7f5 completed April 5, 2026, 2:48 a.m.
NED2 Entity disambiguation (via description) batch_69d1cdefca5c8190a673caca42aaa7d0 completed April 5, 2026, 2:50 a.m.
PD Predicate disambiguation batch_69cd03dd2da881909052fbf29736a773 completed April 1, 2026, 11:39 a.m.
PDg Predicate description generation batch_69cd06abc9248190a506b64e9c516d03 completed April 1, 2026, 11:51 a.m.
Created at: March 30, 2026, 8:29 p.m.