Triple
T980856
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kensington and Chelsea |
E21164
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Royal borough |
C4328
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Royal borough Context triple: [Kensington and Chelsea, instanceOf, Royal borough]
-
A.
metropolitan county
A metropolitan county is an administrative region that encompasses a large urban core and its surrounding suburbs, providing coordinated governance and services across the wider metropolitan area.
-
B.
ceremonial county
A ceremonial county is a geographic area in a country, typically in the United Kingdom, defined primarily for the purposes of lieutenancy and traditional or ceremonial functions rather than for local government administration.
-
C.
District
A District is a defined geographic or administrative area within a larger region, established for governance, organization, or service delivery purposes.
-
D.
district of London
chosen
A district of London is a defined urban area within the Greater London region, characterized by its own local identity, history, and mix of residential, commercial, and cultural features.
-
E.
county council
A county council is a local governing body elected to make decisions, set policies, and oversee public services within a county’s jurisdiction.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493c2b62c8190b616351789ec47f8 |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:40 p.m.