Triple
T9801038
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A3 motorway (France) |
E237837
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban motorway |
C3788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban motorway Context triple: [A3 motorway (France), instanceOf, urban motorway]
-
A.
urban beltway
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
-
B.
urban arterial road
An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
-
C.
motorway
chosen
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
D.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
E.
arterial roadway
An arterial roadway is a high-capacity urban or suburban street designed to efficiently carry large volumes of through traffic between local streets and highways while providing limited direct property access.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84dd4608819097ff4ed00feca280 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:29 p.m.