Triple
T9800892
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | north–south European transport corridor |
E237833
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trans-European transport corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trans-European transport corridor Context triple: [north–south European transport corridor, instanceOf, trans-European transport corridor]
-
A.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
B.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
C.
transalpine railway
A transalpine railway is a rail line that crosses or traverses the Alps, typically using tunnels, viaducts, and mountain passes to connect regions on either side of the mountain range.
-
D.
trade and transportation corridor initiative
A trade and transportation corridor initiative is a coordinated program to develop and optimize key routes, infrastructure, and policies that facilitate efficient movement of goods and people across regions or borders.
-
E.
European transport agreement
A European transport agreement is a formal, often multilateral, accord between European states that harmonizes rules, standards, and procedures for cross-border transportation of goods and passengers to ensure safety, efficiency, and legal consistency.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84dd4608819097ff4ed00feca280 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:29 p.m.