Triple

T9796288
Position Surface form Disambiguated ID Type / Status
Subject GeoNet E237725 entity
Predicate instanceOf P0 FINISHED
Object landslide monitoring network C11955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: landslide monitoring network
Context triple: [GeoNet, instanceOf, landslide monitoring network]
  • A. earthquake monitoring center
    An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
  • B. mass movement
    Mass movement is the downslope transport of soil, rock, and debris under the direct influence of gravity, often occurring rapidly and sometimes catastrophically.
  • C. geohazards risk reduction program chosen
    A geohazards risk reduction program is a coordinated set of policies, practices, and interventions designed to identify, assess, and mitigate risks from geological hazards such as earthquakes, landslides, and volcanic eruptions to protect people, infrastructure, and the environment.
  • D. geological survey
    A geological survey is a systematic investigation and mapping of the Earth's materials, structures, and processes to understand subsurface conditions and support resource management, hazard assessment, and land-use planning.
  • E. loess landform
    A loess landform is a landscape shaped by thick deposits of wind-blown, fine-grained silt that create fertile, easily eroded hills, cliffs, and plains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84dc04488190b9c91193976c0960 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:28 p.m.