Triple
T9748506
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Umiam Lake |
E236376
|
entity |
| Predicate | constructedFor |
P7551
|
FINISHED |
| Object |
Umiam Hydel Project
Umiam Hydel Project is a hydroelectric power generation project in Meghalaya, India, that utilizes the waters of Umiam Lake to produce electricity.
|
E823319
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Umiam Hydel Project | Statement: [Umiam Lake, constructedFor, Umiam Hydel Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Umiam Hydel Project Context triple: [Umiam Lake, constructedFor, Umiam Hydel Project]
-
A.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
-
B.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Indravati Dam
Indravati Dam is a major hydroelectric and irrigation dam in India built on the Indravati River, known for its significant role in regional power generation and water management.
-
E.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Umiam Hydel Project Triple: [Umiam Lake, constructedFor, Umiam Hydel Project]
Generated description
Umiam Hydel Project is a hydroelectric power generation project in Meghalaya, India, that utilizes the waters of Umiam Lake to produce electricity.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Umiam Hydel Project Target entity description: Umiam Hydel Project is a hydroelectric power generation project in Meghalaya, India, that utilizes the waters of Umiam Lake to produce electricity.
-
A.
Indravati Hydroelectric Project
Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
-
B.
Ujh Multipurpose Project
The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Indravati Dam
Indravati Dam is a major hydroelectric and irrigation dam in India built on the Indravati River, known for its significant role in regional power generation and water management.
-
E.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d4eddc8190996fec1417d2bae8 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cd9f68f8b88190b44babf5ae17dfef |
completed | April 1, 2026, 10:42 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1cc4321cc8190a5197d87ebfe38fb |
completed | April 5, 2026, 2:43 a.m. |
| NEDg | Description generation | batch_69d1cfe42058819092e382840b4ed38e |
completed | April 5, 2026, 2:58 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d1d02d31b88190ad7514d7e10bd550 |
completed | April 5, 2026, 2:59 a.m. |
Created at: March 30, 2026, 8:23 p.m.