Triple

T9739093
Position Surface form Disambiguated ID Type / Status
Subject New York City Water Tunnel No. 1 E236140 entity
Predicate instanceOf P0 FINISHED
Object underground infrastructure C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground infrastructure
Context triple: [New York City Water Tunnel No. 1, instanceOf, underground infrastructure]
  • A. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • D. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • E. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84d313e88190983ee6ffd0ef60d2 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 8:22 p.m.