Triple
T9734508
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Regulation 14 on sulfur oxides and particulate matter |
E236023
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | air pollution control measure |
C20932
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: air pollution control measure Context triple: [Regulation 14 on sulfur oxides and particulate matter, instanceOf, air pollution control measure]
-
A.
air pollution control rule
chosen
An air pollution control rule is a regulatory requirement that limits or manages the emission of pollutants into the air from specific sources to protect public health and the environment.
-
B.
air quality management plan
An air quality management plan is a structured framework of policies, strategies, and actions designed to monitor, control, and improve air quality to meet health and environmental standards.
-
C.
tobacco control measure
A tobacco control measure is a policy, regulation, or intervention designed to reduce tobacco use, exposure to tobacco smoke, and the associated health and social harms.
-
D.
emissions control zone
An emissions control zone is a designated geographic area where stricter limits on air pollutants are enforced to reduce environmental and health impacts from sources such as vehicles, ships, and industrial activities.
-
E.
air quality permitting program
An air quality permitting program is a regulatory framework that evaluates, authorizes, and monitors facilities’ air emissions to ensure compliance with air pollution control standards and protect public health and the environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d313e88190983ee6ffd0ef60d2 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:22 p.m.