Triple

T9709449
Position Surface form Disambiguated ID Type / Status
Subject Fukushima Daiichi Unit 4 E234984 entity
Predicate reactorType P3675 FINISHED
Object BWR-4 E397896 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: BWR-4 | Statement: [Fukushima Daiichi Unit 4, reactorType, BWR-4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: BWR-4
Context triple: [Fukushima Daiichi Unit 4, reactorType, BWR-4]
  • A. BWR-4 chosen
    BWR-4 is a General Electric-designed boiling water reactor model widely used in commercial nuclear power plants built during the late 1960s and 1970s.
  • B. BWR-3
    BWR-3 is a third-generation boiling water reactor design developed by General Electric and used in several nuclear power plants worldwide, including Fukushima Daiichi Unit 3.
  • C. K15 pressurized water reactor
    The K15 pressurized water reactor is a French naval nuclear reactor design used to power modern French aircraft carriers and submarines.
  • D. VVER-1000
    VVER-1000 is a Russian-designed pressurized water nuclear reactor model widely used for commercial electricity generation.
  • E. K-East Reactor
    K-East Reactor was one of the plutonium production reactors at the Hanford Site in Washington State, built during the Cold War to support the U.S. nuclear weapons program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84cd8fa0819090a5e243ceb37003 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cd9da7c6188190b086f7e411378268 completed April 1, 2026, 10:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69d19f8476e08190865700679069dee6 completed April 4, 2026, 11:32 p.m.
Created at: March 30, 2026, 8:19 p.m.