Triple
T9708540
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mexibús Line IV |
E234960
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Mexibús line |
C8119
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Mexibús line Context triple: [Mexibús Line IV, instanceOf, Mexibús line]
-
A.
estación del Metro de la Ciudad de México
Una estación del Metro de la Ciudad de México es una instalación de transporte público subterránea o superficial donde los trenes del sistema metro detienen su marcha para permitir el ascenso y descenso de pasajeros, conectando distintas zonas urbanas mediante una red ferroviaria masiva.
-
B.
bus rapid transit line
chosen
A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
-
C.
local bus route
A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
-
D.
Mexico City Metro station complex
A Mexico City Metro station complex is an integrated transit facility comprising one or more metro lines, platforms, concourses, access points, and related services that enable passenger movement, transfers, and connections within the Mexico City urban rail network.
-
E.
trolleybus line
A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84cc78808190a56f3402b7c139a7 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:19 p.m.