Triple
T9696474
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Middlesex Guildhall |
E234665
|
entity |
| Predicate | refurbishmentCompletion |
P740
|
FINISHED |
| Object | 2009 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2009 | Statement: [Middlesex Guildhall, refurbishmentCompletion, 2009]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: refurbishmentCompletion Context triple: [Middlesex Guildhall, refurbishmentCompletion, 2009]
-
A.
renovationCompleted
chosen
Indicates that a renovation process for an entity has been fully finished and is no longer in progress.
-
B.
renovationResult
Indicates the outcome or state produced by a renovation process, linking the renovation activity to its resulting condition or product.
-
C.
rebuiltCompletedIn
Indicates that an entity has undergone a rebuilding process that was fully completed in a specified time or event.
-
D.
renovationPeriod
Indicates the time span during which an object, structure, or entity undergoes renovation or refurbishment.
-
E.
constructionCompleted
Indicates that a construction process or project has been fully finished and reached its completed state.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84cb580c8190a7e5f4b3bcdaf2a4 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cd9d3a88788190a4235a1ab33341ec |
completed | April 1, 2026, 10:33 p.m. |
| PD | Predicate disambiguation | batch_69ccd5b9e93c8190947cce56a3925364 |
completed | April 1, 2026, 8:22 a.m. |
Created at: March 30, 2026, 8:18 p.m.