Triple
T9695321
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lake Hartwell |
E234633
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Hartwell Dam |
E386740
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hartwell Dam | Statement: [Lake Hartwell, hasDam, Hartwell Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hartwell Dam Context triple: [Lake Hartwell, hasDam, Hartwell Dam]
-
A.
Hartwell Dam
chosen
Hartwell Dam is a large hydroelectric and flood-control dam on the Savannah River that creates Lake Hartwell along the Georgia–South Carolina border.
-
B.
Gaston Dam
Gaston Dam is a hydroelectric dam on the Roanoke River in North Carolina that forms Lake Gaston and helps provide power and water management for the region.
-
C.
Buford Dam
Buford Dam is a large hydroelectric and flood-control dam in Georgia that creates Lake Lanier and helps regulate water flow and supply for the Atlanta metropolitan area.
-
D.
Rollins Dam
Rollins Dam is a concrete gravity dam in Nevada County, California, that creates Rollins Reservoir for water storage, hydroelectric power generation, and recreation on the Bear River.
-
E.
Leesville Dam
Leesville Dam is a hydroelectric and flood-control structure on the Roanoke River in Virginia that creates Leesville Lake.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84cb580c8190a7e5f4b3bcdaf2a4 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cd9d366c488190bc153c68fef197c2 |
completed | April 1, 2026, 10:33 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d6a77b6fac81909a9b0998f5dd1e58 |
completed | April 8, 2026, 7:07 p.m. |
Created at: March 30, 2026, 8:17 p.m.