Triple
T9689736
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blackcomb |
E234506
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | unreleased operating system project |
C25946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: unreleased operating system project Context triple: [Blackcomb, instanceOf, unreleased operating system project]
-
A.
unbuilt aircraft project
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
-
B.
unreleased album
An unreleased album is a completed or partially completed collection of recorded music that has not been officially distributed or made publicly available by the artist or rights holder.
-
C.
discontinued operating system
A discontinued operating system is a software platform for managing computer hardware and applications that is no longer developed, supported, or officially distributed by its creator.
-
D.
side project
A side project is a self-initiated, typically smaller-scale endeavor pursued alongside primary work or responsibilities to explore interests, develop skills, or test new ideas.
-
E.
unreleased book
An unreleased book is a completed or in-progress written work that has not yet been made publicly available through publication or distribution.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84ca73208190957a900c8543bdcc |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:17 p.m.