Triple

T9671795
Position Surface form Disambiguated ID Type / Status
Subject Dreadnought-class nuclear-powered ballistic missile submarines E234046 entity
Predicate nuclearWeaponSystem P47242 FINISHED
Object UK Trident programme E803854 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: UK Trident programme | Statement: [Dreadnought-class nuclear-powered ballistic missile submarines, nuclearWeaponSystem, UK Trident programme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: UK Trident programme
Context triple: [Dreadnought-class nuclear-powered ballistic missile submarines, nuclearWeaponSystem, UK Trident programme]
  • A. Trident successor programme chosen
    The Trident successor programme is the United Kingdom’s initiative to replace its current fleet of nuclear-armed Vanguard-class submarines with new ballistic missile submarines to maintain the country’s continuous at-sea deterrent.
  • B. Sea Viper missile system
    The Sea Viper missile system is a modern naval air-defense system designed to protect warships by detecting, tracking, and intercepting multiple airborne threats at long range.
  • C. Nuclear weapons policy of the United Kingdom
    The nuclear weapons policy of the United Kingdom encompasses the country's strategic doctrine, legal frameworks, and international agreements governing the development, deployment, and potential use of its nuclear arsenal.
  • D. British Army modernisation programme
    The British Army modernisation programme is a long-term initiative to transform the Army’s capabilities, equipment, and structure for contemporary and future warfare, including the introduction of advanced armoured vehicles, digital systems, and updated combat doctrines.
  • E. Dreadnought programme
    The Dreadnought programme is the United Kingdom’s initiative to design, build, and deploy a new generation of nuclear-armed ballistic missile submarines to replace the Royal Navy’s current Vanguard-class deterrent fleet.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nuclearWeaponSystem
Context triple: [Dreadnought-class nuclear-powered ballistic missile submarines, nuclearWeaponSystem, UK Trident programme]
  • A. nuclearWeaponsProgram
    Indicates the existence, development, or pursuit of a program related to the research, production, or maintenance of nuclear weapons.
  • B. nuclearCapability
    Indicates that an entity possesses, develops, or has access to nuclear weapons or the technological capacity to produce them.
  • C. nuclearWarheadCarrier chosen
    Indicates that an entity is designed or used to carry, transport, or deliver nuclear warheads.
  • D. nuclearPowered
    Indicates that something operates using nuclear energy as its primary power source.
  • E. militarySystem
    Indicates a relationship where an entity functions as, belongs to, or is characterized by a particular military organizational or operational system.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848f55e48190b3f67252571c3d45 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9c6949108190b699442e5c2aacf9 completed April 1, 2026, 10:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69d18a28d1c481908737992466d35fdd completed April 4, 2026, 10:01 p.m.
PD Predicate disambiguation batch_69ccd5b5d40c8190850ad7a351445f32 completed April 1, 2026, 8:22 a.m.
Created at: March 30, 2026, 8:15 p.m.