Triple

T9667167
Position Surface form Disambiguated ID Type / Status
Subject Windows Boot Manager E233734 entity
Predicate runsAt P12530 FINISHED
Object system startup LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: system startup | Statement: [Windows Boot Manager, runsAt, system startup]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: runsAt
Context triple: [Windows Boot Manager, runsAt, system startup]
  • A. runsFrom
    Indicates that one entity flees or escapes away from another entity.
  • B. runsBetween
    Indicates a relationship where something extends, operates, or connects from one point, entity, or state to another along a path or interval.
  • C. runsApproximately
    Indicates that an entity performs a running action in a manner that is close to, but not exactly matching, a specified time, distance, speed, or other running-related measure.
  • D. runsUnder
    Indicates that one process, task, or component operates within the control, environment, or context provided by another system, platform, or framework.
  • E. startsAt chosen
    Indicates that an event, process, or state begins at a specific time, location, or point in a sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848d3b6c8190ae98ea554dea58df completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9c3a63948190be3f48f87bdbccf1 completed April 1, 2026, 10:29 p.m.
PD Predicate disambiguation batch_69ccd5b3239c8190b3ae3b9bd121e4bd completed April 1, 2026, 8:22 a.m.
Created at: March 30, 2026, 8:15 p.m.