Triple
T9645566
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Manhattan via Williamsburg Bridge |
E233185
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation connection |
C2519
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation connection Context triple: [Manhattan via Williamsburg Bridge, instanceOf, transportation connection]
-
A.
transportation route
chosen
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
B.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
transport hub
A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
-
D.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
E.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848b31648190b57aa55da20285be |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:12 p.m.