Triple

T9638393
Position Surface form Disambiguated ID Type / Status
Subject Pensacola Bay Bridge E232993 entity
Predicate connectsTo P845 FINISHED
Object Gulf Breeze Parkway E396782 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gulf Breeze Parkway | Statement: [Pensacola Bay Bridge, connectsTo, Gulf Breeze Parkway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gulf Breeze Parkway
Context triple: [Pensacola Bay Bridge, connectsTo, Gulf Breeze Parkway]
  • A. West Walton Highway
    West Walton Highway is a small village and locality within the civil parish of West Walton in Norfolk, England.
  • B. Navarre Parkway chosen
    Navarre Parkway is a major roadway and commercial corridor that serves as the primary east–west thoroughfare through Navarre, Florida.
  • C. Peninsula Boulevard
    Peninsula Boulevard is a major thoroughfare in Nassau County, New York, connecting several South Shore communities and serving as a key route between local neighborhoods and larger regional roads.
  • D. B–W Parkway
    B–W Parkway is a major scenic highway in Maryland that connects the cities of Baltimore and Washington, D.C.
  • E. Jacksboro Pike
    Jacksboro Pike is a major roadway running through the Fountain City area of Knoxville, Tennessee, serving as a key local commercial and commuter route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848a5a908190aad251f4137b0c3a completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9b51b08081908e30744607b28953 completed April 1, 2026, 10:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69d19f6a7ddc8190b7e8add97b7dc257 completed April 4, 2026, 11:31 p.m.
Created at: March 30, 2026, 8:11 p.m.