Triple

T9635505
Position Surface form Disambiguated ID Type / Status
Subject OV-104 E232916 entity
Predicate performedMission P89381 FINISHED
Object STS-101 E523878 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-101 | Statement: [OV-104, performedMission, STS-101]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-101
Context triple: [OV-104, performedMission, STS-101]
  • A. STS-101 chosen
    STS-101 was a 2000 Space Shuttle Atlantis mission to the International Space Station focused on resupply, maintenance, and assembly tasks.
  • B. STS-100
    STS-100 was a 2001 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Canadarm2 robotic arm as a key component of the station’s assembly and operations.
  • C. STS-103
    STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
  • D. STS-91
    STS-91 was a NASA Space Shuttle Discovery mission in 1998 that marked the final Shuttle docking with the Russian space station Mir and the last flight of the Spacehab module.
  • E. STS-51-D
    STS-51-D was a 1985 NASA Space Shuttle Discovery mission that deployed communications satellites and conducted scientific experiments in low Earth orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848940cc8190b97cec654cb3bb4a completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9b2ba0308190931993c0321f6051 completed April 1, 2026, 10:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69d99859b5cc81908475fde408802607 completed April 11, 2026, 12:39 a.m.
Created at: March 30, 2026, 8:11 p.m.