Triple

T9627017
Position Surface form Disambiguated ID Type / Status
Subject SAN VORTAC E232494 entity
Predicate instanceOf P0 FINISHED
Object ground-based navigation facility C2386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground-based navigation facility
Context triple: [SAN VORTAC, instanceOf, ground-based navigation facility]
  • A. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • B. navigational aid chosen
    A navigational aid is a tool, device, or system that helps users determine their position and plan or follow a route from one location to another.
  • C. ground-based radar system
    A ground-based radar system is a terrestrial installation that emits radio waves and analyzes their reflections to detect, track, and characterize objects or weather phenomena within its coverage area.
  • D. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. aviation infrastructure network
    An aviation infrastructure network is an interconnected system of airports, airways, navigation aids, communication systems, and support facilities that collectively enable the safe, efficient movement of aircraft and passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848793ec8190a93a12383a754dc0 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 8:10 p.m.