Triple
T9624000
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vestas V90-3.0 MW |
E232412
|
entity |
| Predicate | manufacturer |
P490
|
FINISHED |
| Object | Vestas |
E455780
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vestas | Statement: [Vestas V90-3.0 MW, manufacturer, Vestas]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Vestas Context triple: [Vestas V90-3.0 MW, manufacturer, Vestas]
-
A.
Vestas Wind Systems
chosen
Vestas Wind Systems is a Danish multinational company and one of the world’s leading manufacturers and service providers of wind turbines and renewable energy solutions.
-
B.
Siemens Wind Power
Siemens Wind Power is a division of Siemens that designs, manufactures, and services onshore and offshore wind turbines for renewable energy generation worldwide.
-
C.
Vestas V80
The Vestas V80 is a widely used 2 MW-class onshore and offshore wind turbine model developed by Danish manufacturer Vestas for commercial-scale wind power generation.
-
D.
Ørsted
Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
-
E.
Vestas V90-3.0 MW
The Vestas V90-3.0 MW is a widely used 3-megawatt offshore and onshore wind turbine model designed for high efficiency and reliability in large-scale wind power projects.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca848793ec8190a93a12383a754dc0 |
completed | March 30, 2026, 2:11 p.m. |
| NER | Named-entity recognition | batch_69cd9ad76b148190a38fadee06594db4 |
completed | April 1, 2026, 10:23 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1797ab3d4819088da04fd5d00386b |
completed | April 4, 2026, 8:50 p.m. |
Created at: March 30, 2026, 8:10 p.m.