Triple
T9620595
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Narmada Water Disputes Tribunal Award |
E232331
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | inter‑state river water allocation award |
C8918
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: inter‑state river water allocation award Context triple: [Narmada Water Disputes Tribunal Award, instanceOf, inter‑state river water allocation award]
-
A.
interstate boundary river
An interstate boundary river is a natural watercourse whose channel or thalweg forms all or part of the legal border between two or more states or equivalent political jurisdictions.
-
B.
water resources management agreement
chosen
A water resources management agreement is a formal arrangement between parties that defines rights, responsibilities, and coordinated actions for the sustainable allocation, use, protection, and monitoring of shared water resources.
-
C.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
-
D.
water resources development act
The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
-
E.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84867bb88190b4b57dd5a56d5691 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:09 p.m.