Triple

T960434
Position Surface form Disambiguated ID Type / Status
Subject Red Sea E20723 entity
Predicate instanceOf P0 FINISHED
Object seawater inlet C291 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: seawater inlet
Context triple: [Red Sea, instanceOf, seawater inlet]
  • A. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • B. ocean
    The ocean is a vast, continuous body of saltwater that covers most of Earth's surface, regulating climate and supporting diverse marine ecosystems.
  • C. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • D. body of water chosen
    A body of water is a naturally or artificially formed, relatively distinct accumulation of water—such as a lake, sea, river, or pond—occupying a definable area on the Earth's surface.
  • E. estuary
    An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.