Triple

T959586
Position Surface form Disambiguated ID Type / Status
Subject Alaska Range E20703 entity
Predicate crossedBy P416 FINISHED
Object Parks Highway E102743 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Parks Highway | Statement: [Alaska Range, crossedBy, Parks Highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Parks Highway
Context triple: [Alaska Range, crossedBy, Parks Highway]
  • A. Parks Highway chosen
    Parks Highway is a primary road in Alaska that connects the state’s largest city, Anchorage, with the Denali National Park region and the Interior.
  • B. Richardson Highway
    Richardson Highway is a key Alaska roadway that connects Fairbanks to the port city of Valdez, traversing interior and south-central regions of the state.
  • C. Shirley Highway
    Shirley Highway is a major freeway in Northern Virginia that forms part of the primary commuter route between the suburbs and Washington, D.C.
  • D. Steese Highway
    The Steese Highway is a key road in Alaska that runs northeast from Fairbanks into the interior, serving mining areas and remote communities.
  • E. Alaska Highway
    The Alaska Highway is a historic overland route stretching from British Columbia through the Yukon to Alaska, built during World War II and now serving as a major transportation corridor for the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b412f9f48190be123e8c20f38962 completed March 1, 2026, 9:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac537ba7c08190966fa4a29da90310 completed March 7, 2026, 4:34 p.m.
Created at: March 1, 2026, 7:40 p.m.