Triple

T9589508
Position Surface form Disambiguated ID Type / Status
Subject National Highway Performance Program E231380 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure funding program C18201 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation infrastructure funding program
Context triple: [National Highway Performance Program, instanceOf, transportation infrastructure funding program]
  • A. highway funding program
    A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
  • B. public transportation funding program
    A public transportation funding program is a structured initiative that allocates financial resources to plan, develop, operate, and maintain shared transit services and related infrastructure for the general public.
  • C. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • D. transportation funding measure
    A transportation funding measure is a policy instrument, often a ballot initiative or legislative act, that authorizes and allocates dedicated revenue sources to plan, build, operate, and maintain transportation infrastructure and services.
  • E. transportation funding authorization act chosen
    A transportation funding authorization act is a legislative measure that approves and allocates financial resources for the planning, construction, operation, and maintenance of transportation infrastructure and related programs over a specified period.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8482884481908eccdfdf64d6fbf7 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 8:06 p.m.