Triple

T9583249
Position Surface form Disambiguated ID Type / Status
Subject Fukushima Daiichi Unit 3 E231223 entity
Predicate gridConnectionStatus_postAccident P60365 FINISHED
Object disconnected from grid LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: disconnected from grid | Statement: [Fukushima Daiichi Unit 3, gridConnectionStatus_postAccident, disconnected from grid]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridConnectionStatus_postAccident
Context triple: [Fukushima Daiichi Unit 3, gridConnectionStatus_postAccident, disconnected from grid]
  • A. postDisasterStatus chosen
    Indicates the condition or state of an entity following the occurrence of a disaster.
  • B. resultOfAccident
    Indicates that something exists or occurs as a consequence or outcome of an accident.
  • C. involvedInAccident
    Indicates that an entity participated in, was affected by, or was otherwise a party to a specific accident or collision event.
  • D. accidentPhase
    Indicates the specific stage or phase of progression within an accident or incident event.
  • E. powerOutages
    Indicates that there is a loss or interruption of electrical power supply affecting one or more entities or locations.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848161688190a68d514a0a9d5129 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd99cebaf081908033536a53fbf668 completed April 1, 2026, 10:18 p.m.
PD Predicate disambiguation batch_69ccd59fd7408190b36831902e3f37f7 completed April 1, 2026, 8:21 a.m.
Created at: March 30, 2026, 8:06 p.m.