Triple

T9583245
Position Surface form Disambiguated ID Type / Status
Subject Fukushima Daiichi Unit 3 E231223 entity
Predicate containmentVenting P89940 FINISHED
Object attempted containment venting during accident LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: attempted containment venting during accident | Statement: [Fukushima Daiichi Unit 3, containmentVenting, attempted containment venting during accident]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: containmentVenting
Context triple: [Fukushima Daiichi Unit 3, containmentVenting, attempted containment venting during accident]
  • A. hasVentilationShafts
    Indicates that one entity is equipped with or contains ventilation shafts that provide airflow or air passage.
  • B. ventilationFeature
    Indicates that one entity has a structural or functional role related to providing, enabling, or affecting ventilation for another entity.
  • C. hasSteamVent
    Indicates that one entity possesses or contains a steam vent through which steam is released.
  • D. controlledChamber
    Indicates that an entity has authority over, manages, or directs the operations or decisions of a particular chamber or deliberative body.
  • E. hasVentilationBuildings
    Indicates that certain buildings are designated to provide ventilation for another structure, area, or system.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848161688190a68d514a0a9d5129 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd99cebaf081908033536a53fbf668 completed April 1, 2026, 10:18 p.m.
PD Predicate disambiguation batch_69ccd59fd7408190b36831902e3f37f7 completed April 1, 2026, 8:21 a.m.
PDg Predicate description generation batch_69ccd93e90048190a2b0d7c5c195ba98 completed April 1, 2026, 8:37 a.m.
Created at: March 30, 2026, 8:06 p.m.