Triple

T957800
Position Surface form Disambiguated ID Type / Status
Subject ISO/IEC/IEEE 29148 E20661 entity
Predicate relatedTo P37 FINISHED
Object ISO/IEC/IEEE 15288 E21930 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ISO/IEC/IEEE 15288 | Statement: [ISO/IEC/IEEE 29148, relatedTo, ISO/IEC/IEEE 15288]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ISO/IEC/IEEE 15288
Context triple: [ISO/IEC/IEEE 29148, relatedTo, ISO/IEC/IEEE 15288]
  • A. ISO/IEC 15288 chosen
    ISO/IEC 15288 is an international standard that defines a common framework of processes for the life cycle management of systems, from conception through retirement.
  • B. ISO/IEC 12207
    ISO/IEC 12207 is an international standard that defines a comprehensive framework and set of processes for the life cycle management of software systems.
  • C. IEEE 12207
    IEEE 12207 is an international standard that defines processes, activities, and tasks for the life cycle management of software systems.
  • D. ISO/IEC/IEEE 29148
    ISO/IEC/IEEE 29148 is an international standard that defines best practices and processes for engineering and managing system and software requirements.
  • E. ISO 21500
    ISO 21500 is an international standard that provides high-level guidance and principles for effective project management applicable to organizations of all types and sizes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b3fac2bc8190a66feb70c68899b2 completed March 1, 2026, 9:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69a933b259d08190b03989e2b1575085 completed March 5, 2026, 7:41 a.m.
Created at: March 1, 2026, 7:40 p.m.