Triple

T957017
Position Surface form Disambiguated ID Type / Status
Subject Autopilot E20646 entity
Predicate instanceOf P0 FINISHED
Object advanced driver-assistance system C5178 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: advanced driver-assistance system
Context triple: [Autopilot, instanceOf, advanced driver-assistance system]
  • A. autonomous vehicle project
    An autonomous vehicle project is an organized effort to design, develop, test, and deploy self-driving systems that enable vehicles to perceive their environment, make driving decisions, and operate safely with minimal or no human intervention.
  • B. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • C. integrated air defence system
    An integrated air defence system is a coordinated network of sensors, command and control elements, and weapon systems designed to detect, track, and engage aerial threats to protect designated airspace and assets.
  • D. transportation safety agency
    A transportation safety agency is an organization responsible for regulating, monitoring, and enforcing safety standards across transportation systems to prevent accidents and protect the public.
  • E. sport utility vehicle
    A sport utility vehicle is a versatile passenger vehicle that combines elements of on-road cars and off-road trucks, typically offering higher ground clearance, spacious interiors, and optional all-wheel or four-wheel drive for varied driving conditions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.