Triple

T955738
Position Surface form Disambiguated ID Type / Status
Subject Apple Park E20622 entity
Predicate architectureFirm P2468 FINISHED
Object Foster + Partners E34438 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Foster + Partners | Statement: [Apple Park, architectureFirm, Foster + Partners]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Foster + Partners
Context triple: [Apple Park, architectureFirm, Foster + Partners]
  • A. Foster + Partners chosen
    Foster + Partners is a renowned British architecture firm known for its innovative, high-tech designs and landmark projects around the world.
  • B. Ove Arup & Partners
    Ove Arup & Partners is a globally renowned engineering and design consultancy known for its pioneering structural work on landmark projects such as the Sydney Opera House.
  • C. Zaha Hadid Architects
    Zaha Hadid Architects is a globally renowned architecture firm known for its futuristic, fluid designs and landmark projects around the world.
  • D. Skidmore, Owings & Merrill
    Skidmore, Owings & Merrill is a prominent American architecture and engineering firm renowned for designing major modernist and high-rise buildings worldwide.
  • E. Arup Associates
    Arup Associates is a multidisciplinary architectural and engineering firm known for designing innovative, high-performance buildings and cultural venues.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b3f7a7608190b8a8dd2486654bec completed March 1, 2026, 9:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69a933b00a58819084164f3dd3ecb070 completed March 5, 2026, 7:41 a.m.
Created at: March 1, 2026, 7:40 p.m.