Triple

T95500
Position Surface form Disambiguated ID Type / Status
Subject WAI E1920 entity
Predicate standardDeveloped P1371 FINISHED
Object WAI-ARIA E3759 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: WAI-ARIA | Statement: [WAI, standardDeveloped, WAI-ARIA]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: WAI-ARIA
Context triple: [WAI, standardDeveloped, WAI-ARIA]
  • A. WAI-ARIA chosen
    WAI-ARIA is a technical specification that defines ways to make web content and applications more accessible to people with disabilities by providing semantic information to assistive technologies.
  • B. WAI
    WAI (Web Accessibility Initiative) is a World Wide Web Consortium (W3C) program that develops guidelines, resources, and standards to make the web accessible to people with disabilities.
  • C. WCAG
    WCAG (Web Content Accessibility Guidelines) is an internationally recognized set of guidelines that define how to make web content more accessible to people with disabilities.
  • D. W3C Note
    A W3C Note is a non-normative publication by the World Wide Web Consortium used to share ideas, practices, or information that are not on the standards track.
  • E. PWA
    The Public Works Administration (PWA) was a New Deal U.S. government agency created in 1933 to stimulate economic recovery through large-scale public construction projects such as dams, bridges, schools, and hospitals.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d4862f881908cc8b89d3a78031d completed Feb. 28, 2026, 2:04 a.m.
NER Named-entity recognition batch_69a256a7957c8190bf9924eff7572b95 completed Feb. 28, 2026, 2:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69a262474440819093e075d5a009ee53 completed Feb. 28, 2026, 3:34 a.m.
Created at: Feb. 28, 2026, 2:09 a.m.