Triple

T9549924
Position Surface form Disambiguated ID Type / Status
Subject Pont Louis-Philippe E230393 entity
Predicate currentStructureCompleted P22332 FINISHED
Object 1862 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1862 | Statement: [Pont Louis-Philippe, currentStructureCompleted, 1862]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: currentStructureCompleted
Context triple: [Pont Louis-Philippe, currentStructureCompleted, 1862]
  • A. currentStructure chosen
    Indicates that an entity is the present or active structural configuration or organization associated with another entity.
  • B. remainingStructuresUsedFor
    Indicates that the remaining structures of an entity are utilized for a specified purpose or function.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. usedStructure
    Indicates that one entity makes use of, relies on, or operates through a particular structure (physical, logical, or organizational) to perform its function or action.
  • E. plannedStructure
    Indicates that one entity is a structure that is intended or designed to be built or established in the future, rather than already existing.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847d3be8819099c9dad2a7e786f1 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9906bc90819086f105c453e63c83 completed April 1, 2026, 10:15 p.m.
PD Predicate disambiguation batch_69ccd58bd21881908b860e3ee469af13 completed April 1, 2026, 8:21 a.m.
Created at: March 30, 2026, 8:02 p.m.