Triple

T9543971
Position Surface form Disambiguated ID Type / Status
Subject UK Round 1 offshore wind programme E230234 entity
Predicate instanceOf P0 FINISHED
Object offshore wind licensing round C25986 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: offshore wind licensing round
Context triple: [UK Round 1 offshore wind programme, instanceOf, offshore wind licensing round]
  • A. hydrocarbon exploration licensing round
    A hydrocarbon exploration licensing round is a formal, time-bound process in which a government offers defined areas or blocks for companies to bid on rights to explore for and potentially produce oil and gas resources.
  • B. wind power facility
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • C. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • D. offshore oil and gas development project
    An offshore oil and gas development project is a large-scale, capital-intensive initiative that plans, designs, constructs, and operates facilities at sea to extract, process, and transport hydrocarbons from subsea reservoirs to market.
  • E. offshore petroleum export facility
    An offshore petroleum export facility is a marine-based installation that receives, stores, and transfers produced oil or gas from offshore fields to tankers or pipelines for transport to onshore markets.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847c70b8819088a0a0bad64a50d6 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 8:01 p.m.