Triple
T9543946
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Npower Renewables |
E230233
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wind power company |
C25985
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wind power company Context triple: [Npower Renewables, instanceOf, wind power company]
-
A.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
B.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
C.
wind energy research center
A wind energy research center is a specialized facility dedicated to studying, developing, and optimizing wind power technologies, systems, and policies to advance sustainable energy production.
-
D.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
-
E.
windmill
A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca847c70b8819088a0a0bad64a50d6 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:01 p.m.