Triple
T9542910
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Planernoye depot |
E230200
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway rolling stock maintenance facility |
C23629
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway rolling stock maintenance facility Context triple: [Planernoye depot, instanceOf, railway rolling stock maintenance facility]
-
A.
rolling stock maintenance company
A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
-
B.
rolling stock storage facility
chosen
A rolling stock storage facility is a dedicated area or building where railway vehicles such as locomotives and carriages are parked, secured, and sometimes lightly serviced when not in operation.
-
C.
railway infrastructure element
A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
-
D.
rolling stock
Rolling stock refers to all the vehicles that move on a railway, including locomotives, passenger coaches, freight wagons, and maintenance units.
-
E.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca847c70b8819088a0a0bad64a50d6 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8:01 p.m.