Triple
T9528040
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Outram |
E229812
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planning area |
C13499
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planning area Context triple: [Outram, instanceOf, planning area]
-
A.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
B.
land use planning area
chosen
A land use planning area is a defined geographic region designated for coordinated management and regulation of land uses to achieve specific environmental, social, and economic development objectives.
-
C.
community plan area
A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
-
D.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
E.
planning library
A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8479934c81908006d0e6e970ae05 |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 8 p.m.