Triple

T9525620
Position Surface form Disambiguated ID Type / Status
Subject Ruhrverband E229752 entity
Predicate manages P86 FINISHED
Object Sorpe Reservoir E807132 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sorpe Reservoir | Statement: [Ruhrverband, manages, Sorpe Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sorpe Reservoir
Context triple: [Ruhrverband, manages, Sorpe Reservoir]
  • A. Vouglans Reservoir
    Vouglans Reservoir is a large artificial lake in eastern France, known for hydroelectric power generation, recreation, and its scenic setting in the Jura region.
  • B. Henne Reservoir chosen
    Henne Reservoir is a man-made lake in North Rhine-Westphalia, Germany, primarily used for water supply, flood control, and recreation.
  • C. Ruza Reservoir
    Ruza Reservoir is a large artificial lake in the Moscow region of Russia, created by damming the Ruza River to serve as a key source of water supply and recreation.
  • D. Gorg Blau reservoir
    Gorg Blau reservoir is an artificial mountain lake in Mallorca, Spain, serving as a key freshwater supply within the Serra de Tramuntana range.
  • E. Irganai Reservoir
    Irganai Reservoir is a large artificial lake in Dagestan, Russia, created by the Irganai Dam on the Sulak River for hydroelectric power generation and water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847870a881909d8d751a7d29da39 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd989b529c81909ee18dd3d468c816 completed April 1, 2026, 10:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69d178eb63e08190b069faaa0c5dbcb2 completed April 4, 2026, 8:47 p.m.
Created at: March 30, 2026, 7:59 p.m.