Triple

T9524918
Position Surface form Disambiguated ID Type / Status
Subject Management by objectives E229735 entity
Predicate instanceOf P0 FINISHED
Object goal-setting framework C18334 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: goal-setting framework
Context triple: [Management by objectives, instanceOf, goal-setting framework]
  • A. scaling framework
    A scaling framework is a structured approach that defines the principles, processes, and tools needed to grow a system, organization, or product efficiently and sustainably as demand increases.
  • B. component of personal development framework chosen
    A component of a personal development framework is a distinct, interrelated element—such as a skill area, habit, mindset, or practice—that systematically contributes to an individual’s growth and progress toward their goals.
  • C. design milestone
    A design milestone is a key checkpoint in the design process where specific deliverables are completed and reviewed to assess progress and guide subsequent work.
  • D. long-term plan
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • E. global action plan
    A global action plan is a coordinated, strategic framework that outlines shared goals, responsibilities, timelines, and resources for addressing worldwide challenges across nations and organizations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847870a881909d8d751a7d29da39 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 7:59 p.m.