Triple

T9521574
Position Surface form Disambiguated ID Type / Status
Subject Barrow-in-Furness shipyard E229655 entity
Predicate instanceOf P0 FINISHED
Object submarine construction facility C13842 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: submarine construction facility
Context triple: [Barrow-in-Furness shipyard, instanceOf, submarine construction facility]
  • A. shipbuilding facility chosen
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • B. submarine escape training facility
    A submarine escape training facility is a specialized center equipped with simulators, escape towers, and controlled water environments where submariners are trained in emergency escape procedures, survival techniques, and the use of escape equipment under realistic conditions.
  • C. military submarine
    A military submarine is a stealth-capable naval vessel designed to operate underwater for extended periods to conduct surveillance, reconnaissance, and combat missions.
  • D. shipbuilder
    A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
  • E. naval victualling yard
    A naval victualling yard is a specialized dockyard facility where food, drink, and other provisions are stored, processed, and supplied to naval ships and personnel.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847870a881909d8d751a7d29da39 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 7:59 p.m.