Triple

T9508232
Position Surface form Disambiguated ID Type / Status
Subject West Pier E229324 entity
Predicate instanceOf P0 FINISHED
Object harbor pier C5954 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: harbor pier
Context triple: [West Pier, instanceOf, harbor pier]
  • A. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • B. waterfront pier complex chosen
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • C. harbour village
    A harbour village is a small coastal settlement clustered around a sheltered port, where homes, shops, and community life center on fishing, boating, and maritime trade.
  • D. fishing pier
    A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
  • E. canal wharf
    A canal wharf is a designated waterside area along a canal where boats can moor to load and unload cargo or passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847611c48190a28c028644198c75 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 7:57 p.m.