Triple

T9503200
Position Surface form Disambiguated ID Type / Status
Subject San Gorgonio Pass E229193 entity
Predicate windFarmDevelopmentBegan P33325 FINISHED
Object 1980s LITERAL FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: windFarmDevelopmentBegan
Context triple: [San Gorgonio Pass, windFarmDevelopmentBegan, 1980s]
  • A. windEnergyDevelopment chosen
    Indicates the development, construction, or expansion of facilities and infrastructure for generating energy from wind.
  • B. windFarmCapacity
    Indicates the total power generation capacity of a wind farm, typically measured in units such as megawatts.
  • C. hasWindFarm
    Indicates that one entity possesses, hosts, or contains a wind farm as part of its assets, infrastructure, or territory.
  • D. windResource
    Indicates the availability, quality, or characteristics of wind at a location as a usable energy resource.
  • E. wasWorldsLargestOffshoreWindFarmAtCommissioning
    Indicates that the entity held the status of being the world’s largest offshore wind farm at the time it was officially commissioned.
  • F. None of above.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69ca847611c48190a28c028644198c75 elicitation completed
NER batch_69cd983ea6048190a2d7924c8e6d1fbc ner completed
PD batch_69cca567ca448190bf4bcce8ce7dd54f pd completed
Created at: March 30, 2026, 7:57 p.m.