Triple
T9503200
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Gorgonio Pass |
E229193
|
entity |
| Predicate | windFarmDevelopmentBegan |
P33325
|
FINISHED |
| Object | 1980s |
—
|
LITERAL FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: windFarmDevelopmentBegan Context triple: [San Gorgonio Pass, windFarmDevelopmentBegan, 1980s]
-
A.
windEnergyDevelopment
chosen
Indicates the development, construction, or expansion of facilities and infrastructure for generating energy from wind.
-
B.
windFarmCapacity
Indicates the total power generation capacity of a wind farm, typically measured in units such as megawatts.
-
C.
hasWindFarm
Indicates that one entity possesses, hosts, or contains a wind farm as part of its assets, infrastructure, or territory.
-
D.
windResource
Indicates the availability, quality, or characteristics of wind at a location as a usable energy resource.
-
E.
wasWorldsLargestOffshoreWindFarmAtCommissioning
Indicates that the entity held the status of being the world’s largest offshore wind farm at the time it was officially commissioned.
- F. None of above.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69ca847611c48190a28c028644198c75 |
elicitation | completed |
| NER | batch_69cd983ea6048190a2d7924c8e6d1fbc |
ner | completed |
| PD | batch_69cca567ca448190bf4bcce8ce7dd54f |
pd | completed |
Created at: March 30, 2026, 7:57 p.m.